Transition-piece internals, 14 off
15 Jun 2026Fourteen sets of secondary steel for an East Coast array, on a nine-week drumbeat.
Bridge parapets, A19 overbridge
02 Mar 2026180 m of parapet in 24 m runs, set out to 3 mm over the full length.
Hatch cover refurbishment
20 Nov 2025Six covers stripped, re-plated and re-coated in an eleven-day dry-dock window.
Process module frame, 62 t
08 Aug 2025A single-lift module frame built, trial-fitted and shipped in one piece.
Rolled shell sections, 12 mm
17 Apr 2025Forty shell cans rolled to 0.5% circularity, with no post-weld correction.