Skip to main content

Process module frame, 62 t

A single-lift module frame built, trial-fitted and shipped in one piece.

Process module frame, 62 t

A 62 t module frame for a chemical plant, built as one piece so that the client could lift it in a single crane operation rather than assemble on site.

Getting it out of the bay needed the roller shutter removed and a 1 a.m. road closure. Detailing that move started before the first plate was cut.