Skip to main content
Library wall, Stromness

Library wall, Stromness

14 Feb 2026

Four metres of shelving into a wall that was not straight anywhere.

An eighteenth-century wall with a forty millimetre bow in it. Every upright was scribed on site over two days rather than made to a drawing.

Painted in Scapa Blue, which we mixed for this job and then kept.

SHARE WITH FRIENDS